PMI-GIS Green Data Center Program
Green cogeneration data centers with the consortium that built LATAM's first: on-site power, absorption-chiller cooling, microgrid resilience — tokenized on the XRP Ledger as one MPT per facility.
The Alestra Querétaro facility was named the world's Most Innovative Mega Datacenter (DCD, 2014) — built by this team.
On-ledger structure
LBPMDC on the XRP Ledger
What tokenization changes
Fractional by construction
An $85M oil field or a $25M campus is indivisible in the real world. As an XLS-33 Multi-Purpose Token it divides into millions of units, so a position that used to demand an eight-figure cheque can be taken at the sponsor's stated minimum — and sold in part, not all-or-nothing.
Settlement in seconds, not quarters
Private-market transfers move at the speed of paper: subscription docs, wire, registrar update, weeks of reconciliation. On the XRP Ledger the transfer and the payment are one atomic transaction that closes in a single ledger — roughly four seconds — or does not happen at all.
Compliance encoded in the asset, not bolted on
MPT capability flags are set at issuance and are immutable thereafter. require_auth means only KYC-approved holders can ever hold the token; clawback preserves the issuer's legal remedy; lock enables lockups and regulatory freezes. The rulebook travels with the token.
A cap table you can audit, not request
Every unit, every holder, every transfer is a ledger entry with cryptographic finality. There is no quarterly registrar statement to wait for — the register is the chain, and it is queryable at any instant.
Liquidity where none existed
The XRP Ledger has had a native, on-ledger order book since 2012. A tokenized asset can list against XRP or RLUSD the moment it is issued, giving private-market positions a continuous secondary market instead of a seven-to-ten-year lockup.
Cost that does not eat the return
Transaction fees are fractions of a cent, and no custodian, transfer agent or clearing house takes a spread. Distributions can reach thousands of holders for less than the cost of a single wire.
If you want the detail
Deep dive
Nothing here is required reading. Open what matters to you.
The full thesis
A development partnership with the PMI-GIS consortium: PMI International (Florida, data-center design/build since 1983, 50+ facilities across the US, Mexico and LATAM) and Green Island Solutions (Mexico, 2015 — efficient cogeneration and green energy). The consortium built LATAM's first green cogeneration data center (Alestra, Querétaro, 2014 — ICREA Level 5, energy consumption cut by up to 40%) and carries an active pipeline from 2.2 MW resort microgrids in the Caribbean to a 65 MW development in Punta Cana. Delivery models: EPC, PPA or owner-operator, with microgrid and cogeneration engineering as the core advantage.
PMI International has designed, built or managed 50+ critical-power and data-center facilities since 1983 for clients including AT&T, HSBC, NASA, Disney, Banamex/Citi, BBVA, Telmex and Televisa. GIS contributes efficient cogeneration, clean-gas and green-energy engineering under EPC, PPA or owner-operator models.
The reference asset is the Alestra green data center in Querétaro (2014): LATAM's first cogeneration data center, ICREA Level 5 certified, recognised by Data Center Dynamics as the Most Innovative Mega Datacenter — with energy consumption reduced by as much as 40% through absorption-chiller cooling from waste heat.
The active pipeline spans Mexico and the Caribbean: executed plants from 0.5 to 12 MW, resort microgrids under development in Jamaica (2.2 MW), the Bahamas (4.5 MW) and the Dominican Republic (65 MW, Punta Cana), and two awarded 30–40 MW industrial projects in Silao pending permitting.
LiquidLabs' structuring layer wraps each facility as one XLS-33 MPT — ownership and redeemable capacity (storage / compute / energy) in a single ledger object — settled in RLUSD on the XRP Ledger, under the LiquidManzana regional brand.
Caribbean development pipeline
Resort and city-scale microgrids
Moon Palace Ocho Ríos (2.2 MW), Bakers Bay Bahamas (4.5 MW, generation + BESS), Moon Palace Punta Cana (65 MW design/cogeneration) — under development by the consortium.
Tokenized capacity (LiquidLabs)
One MPT per facility
Ownership plus redeemable storage/compute/energy credits in one token; RequireAuth, clawback and lock set at issuance; settled in RLUSD. Platform layer — in build, testnet first.
Important information
Consortium track record and pipeline figures are sponsor-supplied (PMIGIS 2024 deck) and not independently verified. Offering economics shown are illustrative placeholders — no offering is structured, priced or open; the platform has no live settlement path. Not an offer of securities.
Funding progress is illustrative and maintained by the platform administrator until the sponsor supplies live subscription data.
Demonstration listing. Trading happens on XRPL testnet with valueless test tokens. No securities are offered or sold through this interface.
Order book
Bids
No bids yet.
Asks
No asks yet.